Permanent underground electrical cabling


All new permanent electrical cabling installed underground ready to be terminated and hooked up to the existing

concrete light poles for the race track.


Four new 1500w lights to be installed on top of these concrete poles for better track lighting


More light poles installed


               1st New light pole footing at safety catch net area                2nd at the North end of the staging lanes


       3rd Steel light pole footing at South end of the staging lanes        The three new steel poles to be erected at these positions



Two new concrete poles have been erected around the track for extra lighting.


       1st concrete pole at the Burnout Pad                2nd concrete pole in the pits next where the permament

                       ready to have lights attached.                                scrutineers bay will be erected.


Power cable moved from the old ticket box to the new one

ready to have the double power point attached.



A new bigger electrical cable has been installed to the middle light tower in the pit area.

This will allow for power boards to be installed so competitors can have powered pit areas.



This is where all the cables come back to the clubrooms